Neptune Mechanical
Held the general construction permit on the New Building job for 1 New York City condominium, as the Department of Buildings records it. Each building below links its DOB job. A contractor replaced partway through still counts for the building.
- Buildings
- 1
- Residential units
- 1
- Average $/unit
- —
- Year
- 2016
Pro · Advanced analysis
Recent Growth
Neptune Mechanical's buildings and units by year for the last 6 years, and whether the pace is rising or falling.
No buildings accepted since 2021. 0% of all 1 dated buildings are from the last 3 years.
| Year accepted | Buildings | Units |
|---|---|---|
| 2026 to date | 0 | — |
| 2025 | 0 | — |
| 2024 | 0 | — |
| 2023 | 0 | — |
| 2022 | 0 | — |
| 2021 | 0 | — |
Latest: 501 Leonard Street Condominium, accepted Nov 3, 2016.
Strongest Relationships
No other firm is named with Neptune Mechanical on more than one building yet.
From the same offering plans as the table below. A firm's own affiliates aren't counted.
Pro
The rest is for subscribers
Subscribe to see the full page, along with the rest of our charts and analysis.
| Condominium | Accepted | Units | $/unit |
|---|---|---|---|
| 501 Leonard Street Condominium501 Leonard Street · Brooklyn · new constructionNamed as Neptune Mechanical LLC · Sponsor: 501 Leonard Sreet LLC · DOB job 320612360 ↗ · permits 2015–2016 | 2016 | 1 | — |
$/unit is the offering price on the AG record divided by the residential units; the average is across the plans with both. Different spellings of one contractor's name are counted together.