THE CONDO BOOK PROJECT

Bmir Group

Held the general construction permit on the New Building job for 3 New York City condominiums, as the Department of Buildings records it. Each building below links its DOB job. A contractor replaced partway through still counts for the building.

Buildings
3
Residential units
15
Average $/unit
$829,375
Years
2022–2025
ManhattanBrooklynQueensBronxStaten Island Decatur Lofts, 1226 Decatur Street1255 Decatur Street Condominium, 1255 Decatur Street24 Fayette Street Condominium, 24 Fayette Street

Pro · Advanced analysis

Recent Growth

Bmir Group's buildings and units by year for the last 6 years, and whether the pace is rising or falling.

2 buildings accepted in 2024–2026 (2026 to date), against 1 in 2021–2023: up 100%. 67% of all 3 dated buildings are from the last 3 years.

Year acceptedBuildingsUnits
2026 to date0—
202528
20240—
20230—
202217
20210—

Latest: Decatur Lofts, accepted Dec 30, 2025.

Strongest Relationships

The firms named most often on the same buildings as Bmir Group, at least 2 in common.

Developers

  • BNM Holdings2 shared buildings · 67% of Bmir Group's · 2025

Sponsor's counsel

Construction lenders

From the same offering plans as the table below. A firm's own affiliates aren't counted.

Pro

The rest is for subscribers

Subscribe to see the full page, along with the rest of our charts and analysis.

Subscribe to seeAlready a member? Sign in

CondominiumAcceptedUnits$/unit
Decatur Lofts1226 Decatur Street · Brooklyn · new constructionNamed as Bmir Group LLC · Sponsor: 1226 Decatur LLC · DOB job 320911260 ↗ · permits 202120250—
1255 Decatur Street Condominium1255 Decatur Street · Brooklyn · new constructionNamed as Bmir Group LLC · Sponsor: Rbm Central Ave LLC · DOB job 321005372 ↗ · permits 2019–202120258$758,750
24 Fayette Street Condominium24 Fayette Street · Brooklyn · new constructionNamed as Bmir Group LLC · Sponsor: 24 Fayette LLC · DOB job 321385229 ↗ · permits 2019–202120227$900,000

$/unit is the offering price on the AG record divided by the residential units; the average is across the plans with both. Different spellings of one contractor's name are counted together.