THE CONDO BOOK PROJECT

CGT Construction

Held the general construction permit on the New Building job for 2 New York City condominiums, as the Department of Buildings records it. Each building below links its DOB job. A contractor replaced partway through still counts for the building.

Buildings
2
Residential units
168
Average $/unit
$1.18 million
Years
2009–2012
ManhattanBrooklynQueensBronxStaten Island Williamsburg Terrace (Residential Units), 195 - 205 Berry Street A/K/A 129-139 North 3rWilliamsburg Ths Condominium F/K/A Williamsburg Terrace, 195-205 Berry Street Aka 129-139 N. 3rd St

Pro · Advanced analysis

Recent Growth

CGT Construction's buildings and units by year for the last 6 years, and whether the pace is rising or falling.

No buildings accepted since 2021. 0% of all 2 dated buildings are from the last 3 years.

Year acceptedBuildingsUnits
2026 to date0—
20250—
20240—
20230—
20220—
20210—

Latest: Williamsburg Terrace (Residential Units), accepted Nov 6, 2012.

Strongest Relationships

The firms named most often on the same buildings as CGT Construction, at least 2 in common.

Construction lenders

  • Broadway Bank2 shared buildings · 100% of CGT Construction's · 2009–2012

From the same offering plans as the table below. A firm's own affiliates aren't counted.

Pro

The rest is for subscribers

Subscribe to see the full page, along with the rest of our charts and analysis.

Subscribe to seeAlready a member? Sign in

CondominiumAcceptedUnits$/unit
Williamsburg Terrace (Residential Units)195 - 205 Berry Street A/K/A 129-139 North 3r · Brooklyn · new constructionNamed as CGT Construction Inc · Sponsor: North 3rd Bedford LLC · DOB job 302334597 ↗ · permits 2011–2013201284—
Williamsburg Ths Condominium F/K/A Williamsburg Terrace195-205 Berry Street Aka 129-139 N. 3rd St · Brooklyn · new constructionNamed as CGT Construction Inc · Sponsor: North 3rd Townhouses LLC · DOB job 302334597 ↗ · permits 2011–2013200984$1.18 million

$/unit is the offering price on the AG record divided by the residential units; the average is across the plans with both. Different spellings of one contractor's name are counted together.