Design 2020
Held the general construction permit on the New Building job for 1 New York City condominium, as the Department of Buildings records it. Each building below links its DOB job. A contractor replaced partway through still counts for the building.
- Buildings
- 1
- Residential units
- 1
- Average $/unit
- —
- Year
- 2023
Pro · Advanced analysis
Recent Growth
Design 2020's buildings and units by year for the last 6 years, and whether the pace is rising or falling.
0 buildings accepted in 2024–2026 (2026 to date), against 1 in 2021–2023. 0% of all 1 dated buildings are from the last 3 years.
| Year accepted | Buildings | Units |
|---|---|---|
| 2026 to date | 0 | — |
| 2025 | 0 | — |
| 2024 | 0 | — |
| 2023 | 1 | 1 |
| 2022 | 0 | — |
| 2021 | 0 | — |
Latest: 1502 46th Street Condominium, accepted May 5, 2023.
Strongest Relationships
No other firm is named with Design 2020 on more than one building yet.
From the same offering plans as the table below. A firm's own affiliates aren't counted.
Pro
The rest is for subscribers
Subscribe to see the full page, along with the rest of our charts and analysis.
| Condominium | Accepted | Units | $/unit |
|---|---|---|---|
| 1502 46th Street Condominium1502 46th Street · Brooklyn · new constructionNamed as Design 2020 LLC · Sponsor: 15th Ave Lofts LLC · DOB job 321519825 ↗ · permits 2020 | 2023 | 1 | — |
$/unit is the offering price on the AG record divided by the residential units; the average is across the plans with both. Different spellings of one contractor's name are counted together.