THE CONDO BOOK PROJECT

What a New NYC Condo Spends in Year One, and Where the Budget Runs Low

Updated · 8 min read

Short answer: The median new NYC condo budgets about $6,500 per unit a year to run the building, and that sponsor's number runs low in predictable places. Utilities usually get a cushion (73% of recent energy footnotes add one, typically 10%). Insurance almost never does: only 13 of 719 insurance footnotes add anything to the broker's quote, though insurance costs have risen fastest. The first closing comes a median 8 months into the budget year printed in the plan, and Local Law 97 is almost never budgeted.

The Headline Number: Operating Cost per Unit

Per residential unit, the first-year budget varies widely by building size. These are medians, since a few very expensive buildings pull averages up (sizes with fewer than five plans are left out):

Building size (residential units)Median per unit / yearMedian total budgetPlans
2–6$6,900$27,000337
7–12$5,200$48,000219
13–30$6,100$136,00099
31–100$8,100$481,00065
101+$9,700$1.7M18

In recent plans, 7–12 unit buildings have the lowest median per-unit cost. Smaller buildings split fixed costs (insurance, the audit, a minimum management fee) among few owners; bigger ones add elevators, staff and amenities. By borough, the median per unit per year: Brooklyn $6,200, Manhattan $19,400, Queens $5,300. To judge a specific building, see how much condo common charges should be.

The Rules Behind Schedule B

Schedule B isn't free-form. The Attorney General's rules for new-construction condo plans, 13 NYCRR Part 20 (section 20.3(h)), set its format and what each footnote must say:

An outside expert with property management experience must certify the budget as "reasonable and adequate," and the certification must be dated within 90 days before the plan is submitted (section 20.4(d)). That certifies the budget against the rules, not against what the building will actually cost in year three.

What Gets Padded and What Doesn't

Because the rule asks for it, most utility footnotes add a cushion. Of the 759 recent budgets with an energy footnote, 73% add a stated inflation allowance, typically 10% on top of the engineer's estimate. 53% of water footnotes do the same.

Insurance is the opposite. Only 13 of 719 insurance footnotes add anything to the broker's quote. The line is the quote, often months old by filing. Yet in our insurance study the median insurance line per apartment rose far faster than any other line between 2020–2022 plans and 2025–2026 plans. So the line most likely to jump at the first renewal is the one budgeted with no margin.

The catch: the payroll footnote is required to include raises already set by contract, but most new condos are non-union (only 7% of recent plans for 26 or more homes that say either way are union), so most budgets assume no raise at all. See what new condos spend on staff.

By the First Closing, the Budget Year Is Half Over

We compared the budget year printed in 1,089 original offering plans (accepted 2015 to 2024) with the date of the building's first recorded sale. The first closing came a median 8 months after the budget year began. In 63% of plans it was more than six months; in 28%, more than a year, so the "first year" in the original plan ended before anyone moved in.

Part 20 deals with this. If the start of condo operations slips more than six months past the budget year, the sponsor must file an amendment with a revised budget. If the revised projections are 25% or more above the original, every purchaser gets the right to rescind, with at least 15 days to decide, and gets the deposit back.

Bottom line: read the latest Schedule B filed by amendment, not the one in the original plan. And note the threshold: a revised budget just under 25% higher changes your carrying cost but doesn't let you walk away. See how to find offering plan amendments.

Where the Money Goes: Schedule B Line Items

Average share of the expense budget, among plans that have each line:

Average share of the first-year budget, by line item
Staff & cleaning (where present)22% · 366 plans
Insurance17% · 740 plans
Water & sewer15% · 735 plans
Management fee13% · 395 plans
Reserve / contingency12% · 717 plans
Utilities (electric, gas, heat)10% · 719 plans
Elevator (where present)9% · 83 plans
Legal & accounting8% · 737 plans
Repairs & maintenance8% · 729 plans

Among the plans that have each line; the number of plans with the line follows each share.

Condo Book Researchcondobooknyc.com/research/first-year-condo-operating-expenses-nyc-schedule-b

Insurance is the second-biggest of the 9 line kinds, an average 17% of the budget, and it's the line budgeted with no cushion. Water and sewer takes 15%: the city bills the building, not each apartment, and the cost lands in common charges.

Management averages about $22,100 a year, roughly $1,380 per unit, 13% of the budget. In 25% of these plans that name a first managing agent, the sponsor manages the building itself, and 140 of those 177 record no fee. Part 20 requires a plan with no paid manager to say charges will go up when one is hired; take it literally.

The reserve line is not the reserve fund. The budgeted reserve or contingency averages 12% of the budget, but money in the bank at closing is a separate item in Part I of the plan. Where a plan states a reserve fund amount, the average is about $12,200, and 30% of those plans put it at zero. See reserve funds.

What the Budget Leaves Out

How to Read a Schedule B

Income comes first (common charges, plus any commercial, parking or storage income), then expenses, then the total. Mixed-use buildings may have separate budgets for the residential and commercial sections. The footnotes are the real content: the engineer's kWh and therm estimate and the cushion on top, the broker's quote with its insured value and deductible, the staffing schedule, the management fee.

Open any building from The Condo Book Project's search and check its Budget tab; we've parsed Schedule B for over 2,100 plans. Or search "buildings with insurance over 20% of budget". The common charges data page has per-unit and per-square-foot figures by size.

FAQ

What is Schedule B in a condo offering plan?

The sponsor's projected budget for the condo's first year of operation: income, each expense line, and footnotes giving the basis for each number. Its format and footnotes are set by the Attorney General's rules, 13 NYCRR Part 20. For where it sits in the plan, see Schedule A and Schedule B explained.

Where does a first-year budget usually run low?

Insurance, which is budgeted at the broker's quote with no allowance for the renewal (13 of 719 recent insurance footnotes add one); staff, where most non-union budgets assume no raise; management, where the sponsor manages for free; and Local Law 97, which almost no budget mentions.

What is the biggest expense in a NYC condo budget?

The largest line on average is staff and cleaning, 22% of the budget among plans that have it. The other big lines are insurance (17%), water and sewer (15%) and management, where the plan has a fee (13%).

What happens if the building opens late?

If condo operations start more than six months after the budget year in the plan, the sponsor must file an amendment with a revised budget. If the new projections are 25% or more above the original, every purchaser can rescind and get the deposit back. In the plans we checked, the first closing came a median 8 months into the original budget year.

Is the Schedule B budget guaranteed?

No. It is a projection, certified as reasonable by an expert the sponsor hires. Some sponsors guarantee common charges for a period; the plan says if they do.

Where do these figures come from?

Per-unit medians and line shares: the 741 NYC condo offering plans accepted since Nov 24, 2021 with a reconciled Schedule B, a single budget, no commercial units and a Schedule A unit list, the same plans as the common charges data page. The per-unit medians leave out 2 plans whose budget is spread over far fewer homes than the plan has (739 plans remain); line shares are averages. Padding, legal fees and Local Law 97 in budgets: the 917 budgets of plans accepted since Oct 26, 2021, read from each line's footnote. Budget year against first closing: 1,089 plans accepted 2015 to 2024, using the first sponsor sale recorded in ACRIS. Local Law 97 mentions: full-text search of plans accepted since 2020 whose Schedule A gives every apartment's size. Budgets are sponsor projections; updated as of Nov 24, 2026.

Related: Condo Supplies Cost per Unit, by Size · Why NYC Condo Operating Costs Differ