200 Amsterdam Avenue: What the Offering Plan Says About This Lincoln Square Tower

Updated · 7 min read

200 Amsterdam Avenue is a 112-unit Lincoln Square condo tower from SJP Residential and Mitsui Fudosan America, with amenity floors below grade and on the second floor. Here's what its offering plan says about finishes, amenities, staffing, the budget and the fine print.

In brief: 200 Amsterdam Avenue is a new 112-apartment condo tower in Lincoln Square on the Upper West Side, sponsored by a venture of SJP Residential and Mitsui Fudosan America and accepted for filing in December 2017. The plan describes a tower served by elevators up to the 53rd floor, with the upper-floor homes reached through private elevator vestibules. What sets it apart, per the plan: an amenity program built around a 75-foot pool with a budgeted lifeguard operator, a staff planned as non-union, a single ground-level medical office unit sharing the building, and a recorded covenant that has the condo pay the neighboring Lincoln Towers community every year.

What's Specific to It

The offering plan, filed with the New York Attorney General, shows what listings don't: what's behind the walls, who staffs the lobby and what owners pay for.

At a Glance

Finishes

The architect's specifications list brands by apartment line; fixtures vary by layout. For context, see our guide to NYC condo finishes.

Kitchen

Bathrooms

Tip: Compare with our bathroom brands guide.

Floors, windows and ceilings

Laundry, heating and cooling

Amenities

The amenities sit mainly on two levels: an aquatic and fitness level on Subcellar 1 and an amenity floor on the second floor, which includes an outdoor terrace. The plan lists:

Good to know: The sponsor and board may charge fees to reserve and use amenities. The full package is expected once at least half the units have closed. Compare the lineup with similar buildings in our amenities by building size guide.

Staffing and Services

The first-year budget puts payroll and related costs at about $1.08 million, the biggest line in the budget. The plan lays out:

The plan states that the staff will be non-union, with wages that meet state minimum wage laws. The service contracts also pay about $175,000 for a pool operator and cover BuildingLink. See our doorman cost guide.

What It Costs to Run

The sponsor's first-year budget (projected for July 2020 to June 2021) totals about $3.6 million. Residential common charges cover almost all of it, roughly $3.5 million across 112 homes, or about $2,600 a month on average. Your unit's actual charge depends on its share of the common interest. Notable lines:

Common charges include gas for heat and hot water and the building's water. You pay your apartment's electricity, including your heat pumps, directly to Con Edison. At closing, buyers contribute one month of common charges to working capital. See common charge benchmarks and why operating costs differ.

Fine Print Worth Knowing

Who's Behind It

Common Questions

Does 200 Amsterdam Avenue have a pool?

Yes. The plan describes a pool about 75 feet long on Subcellar 1, part of an aquatic and fitness center with a golf simulator, gym, spa, sauna and steam rooms, and the budget includes a lifeguard operator.

Is there parking at 200 Amsterdam Avenue?

The plan doesn't offer any parking. It does sell licenses for 89 storage lockers and 60 bike racks, first come, first served; read more about how buildings handle this in our parking guide.

What is the Lincoln Towers payment?

It's an annual payment of $300 per residential unit that the building owes the Lincoln Towers Community Association under a 2015 declaration of restrictions tied to the site's zoning, budgeted at about $34,000 in the first year.

Where this comes from: the building's offering plan (CD170043) filed with the New York Attorney General, including its Description of Property and Specifications, Special Risks and the sponsor's Schedule B first-year budget. Figures are the sponsor's projections, rounded, and may have changed in later amendments. Browse more plans on The Condo Book Project. Updated October 2026.